Spring Branch Water Plant Rehabilitation Project

City of Houston

Home ยป Spring Branch Water Plant Rehabilitation Project

Kenall carried out design and construction phase services for upgrades to the booster pump station and disinfection process of Spring Branch Water Plant. The upgrades resulted in increasing plant treatment capacity from 9.5 to 17.3 million gallons per day.

We assisted in the plant upgrades across numerous engineering disciplines, providing drawings, specifications, bid quantities, estimated construction costs, and owner’s engineer services during construction. We conducted studies to determine disinfection rates for the booster pump station. We performed hydraulic calculations, sizing and specifying the pumps, layout of the pumps and piping system. For the chloramination facilities, and we specified sizing, layout and operation requirements. We also provided site layout, structural design, architecture, and HVAC engineering for the control room.